节点文献

框-剪结构剪力墙局部中断的设计探讨

Discussion on Design of Frame-Shear Wall Structures with Partial Interrupted Shear Walls

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 施金平

【Author】 SHI Jinping(Sino-Sun Architects & Engineers Design Co.Ltd,Xiamen Department,Xiamen 361009,China)

【机构】 北京东方华太建筑设计工程有限责任公司厦门分公司 厦门361009

【摘要】 通过分析框-剪结构的协同工作原理,从概念上探讨了剪力墙局部中断的合理性。结合2个工程实例,对剪力墙局部中断与均通至顶部两种情况的周期、位移、刚度比、配筋等方面进行比较,结果表明剪力墙局部中断对结构侧向刚度的影响可以忽略、顶部位移有所减小,抗震性能反而略优。采用此方法,可以减少混凝土用量,节约工程造价,可供类似工程参考。

【Abstract】 Based on the analysis of interaction in frame-shear wall structures,the reasonabability of partial interruption of shear walls was discussed on design concepts.The comparison analysis of period,displacement,stiffness ratio and reinforcement on different conditions with partial shear wall interruption and all shear walls up to roof was performed based on two practical engineering projects.The results show that the influence of partial shear wall interruption on lateral stiffness of the structure can be neglected,roof displacement can be reduced slightly and the seismic performance is enhanced slightly.Volume of concrete can be reduced and the project cost can be cut accordingly by using this method.

  • 【文献出处】 结构工程师 ,Structural Engineers , 编辑部邮箱 ,2007年06期
  • 【分类号】TU398.2
  • 【被引频次】4
  • 【下载频次】78
节点文献中: 

本文链接的文献网络图示:

本文的引文网络