节点文献
并联复合隔震技术在文物建筑整体平移中的应用
RESEARCH ON THE APPLICATION OF PARALLEL COMPOSITE ISOLATION TECHNOLOGY IN INTEGRAL MIGRATION OF CULTURAL RELIC BUILDING
【摘要】 将摩擦滑移隔震支座作为滑动装置进行建筑整体平移,结构就位后再连接橡胶隔震支座组成并联复合隔震结构体系。这种施工方法平移启动力较小,启动时对结构产生的振动小,提高了平移施工速度,降低了施工难度并通过改变结构的动力特性改善了建筑的抗震性能。通过某文物建筑平移实例研究这种方法的施工工艺,为工程应用提供依据。通过对就位连接后的建筑进行有限元分析,分析结果表明:复合隔震技术对降低结构地震反应有显著作用。
【Abstract】 As the slipping device in integral migration of a building,the friction-sliding isolation bearings together with the rubber isolation bearings which is used after the structure taking its place compose the parallel composite isolation system.By applying this method,it will save effort,have a lower vibration to the structure,increase the working efficiency,reduce the construction difficulty,and improve the seismic capacity by changing dynamic characteristics.In this paper,the construction technology of the method was researched in a integral migration project of cultural relics,which provided a reference for project design and application.It was proved that the technique of parallel composite isolation analysed by the general finite element software could reduce structural seismic response significantly.
【Key words】 parallel composite isolation; integral migration of building; slipping device; finite element analysis; dynamic characteristics;
- 【文献出处】 工业建筑 ,Industrial Construction , 编辑部邮箱 ,2013年01期
- 【分类号】TU352.12
- 【被引频次】4
- 【下载频次】158