节点文献

破冰技术在松花江流域栈桥保护中的应用

Application of Ice-breaking Technique in Protection of Steel Landing Pier in Watershed of Songhuajiang River

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 王闯王世玉宿磊

【Author】 WANG Chuang,WANG Shi-yu,SU Lei(No.2 Eng.Co.Ltd.of CCCC First Harbor Eng.Co.Ltd.,Qingdao Shandong 266022,China)

【机构】 中交一航局第二工程有限公司

【摘要】 针对哈大铁路客运专线第二松花江特大桥1083号、1084号水中墩施工过程中钢栈桥在凌汛期间的防护工作,详述了破冰桩施工、流冰路开设、流冰的破碎与疏导等钢栈桥的综合防凌保护措施。这些措施的成功应用,使钢栈桥顺利度过凌汛期,并为今后类似工程提供了宝贵的经验。

【Abstract】 Based on the successful protection of the steel landing pier in the ice flood period during the construction of No.1083 and No.1084 in-water piers of the second super large bridge over the Songhuajiang River on Harbin-Dalian Passenger Railway Line,the paper describes the integrative measures to protect the steel landing pier against ice jamming floods by building ice-breaking piles,opening passages for drift-ice flowing,and breaking and channeling away of drifting ice.The successful implementation of these measures helped the steel landing pier successfully get over the ice-flood period and may provide valuable engineering experiences for other similar projects in future.

  • 【文献出处】 中国港湾建设 ,China Harbour Engineering , 编辑部邮箱 ,2008年05期
  • 【分类号】U448.18;U445.4
  • 【下载频次】50
节点文献中: 

本文链接的文献网络图示:

本文的引文网络