节点文献

太原某电厂基坑降水方案优化及其应用

The foundation pit dewatering plan’s optimization and its application of a Taiyuan power plant

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 赵书明

【Author】 ZHAO Shu-ming

【机构】 山西省电力勘测设计院

【摘要】 基坑降水过程中由于多采用经验渗透系数,降水井布置不合理,直接影响基础及上部结构的施工。本文以太原市某电厂基坑降水为实例,通过抽水试验确定渗透系数,采用大口井方法确定基坑涌水量和基坑影响半径,制定合理的基坑降水及基坑支护和回灌技术方案,并推广该技术方案在在电力行业中的应用。

【Abstract】 Dewatering well set unreasonable because of using the experience hydraulic conductivity in the process of the dewatering,which has a direct effect on the construction of the foundation and superstructure.This paper takes the case of dewatering of a power plant in Taiyuan,obtain the hydraulic conductivity by pumping test,use large opening well method to ascertain the water inflow and radius of influence of the foundation pit,formulate reasonable plans for dewatering and recharge,and promote this plans in the application of the power industry.

  • 【文献出处】 工程勘察 ,Geotechnical Investigation & Surveying , 编辑部邮箱 ,2010年S1期
  • 【分类号】TU753.66
  • 【被引频次】1
  • 【下载频次】107
节点文献中: 

本文链接的文献网络图示:

本文的引文网络