节点文献

跨孔地震波孔距的探讨

Study of Cross-hole Seismic Wave Pitch

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 裴少英李晓磊涂善波

【Author】 Pei Shaoying,Li Xiaolei,Tu Shanbo(Institute of Geophysical Prospecting,Yellow River Engineering Consulting Co.,Ltd Zhengzhou Henan 450003,China)

【机构】 黄河勘测规划设计有限公司工程物探研究院

【摘要】 当前,大坝、高层建筑的地基都需要进行模量值的确定,而跨孔地震波法是常用的方法,但如果测试时孔间距选择不合理,获取的不是直达波或者是非所求层的直达波。本文通过对二层地质结构激振后所产生的波系及其正演时距方程做出P、S波系的时距曲线,根据时距曲线确定了几个特征点的坐标,然后由直达波的时距方程计算出了S1波初至不受P1波续至振动干扰的最小距离x,最终确定了选择合理孔距的方程式,并通过一个工程实例来说明。

【Abstract】 Today,the dam and high buildings’ foundation should be confirmed by the modulus.The cross-hole seismic wave method is a common one,but if the pitch is unreasonable during testing,the direct wave can not be obtained or the obtained layer of the direct wave is not wanted.The paper takes a time-distance curve of P-wave and S-wave based on the waves produced by vibrating the geological structure with two layers and their forward-calculated time-distance equation.It determines the coordinates of several feature points according to the above curves.Then it uses the direct wave time-distance equation to calculate the minimum distance x that S1-wave not interfered with the vibration of the P1-wave’s second wave.At last the equation of the right pitch is determined and an example is illustrated.

  • 【文献出处】 工程地球物理学报 ,Chinese Journal of Engineering Geophysics , 编辑部邮箱 ,2012年02期
  • 【分类号】P631.4
  • 【下载频次】33
节点文献中: 

本文链接的文献网络图示:

本文的引文网络