节点文献
预应力锚索在十三陵抽水蓄能电站上池西北坡加固中的应用
APPLICATION OF PRESTRESSING FORCE ANCHORED CABLE IN THE FASTENING THE NORTHWESTERN SLOPE OF SHISANLING PUMPED STORAGE POWER STATION
【摘要】 十三陵抽水蓄能电站上池位于蟒山山顶,不仅蓄水发电,而且作为"天池"为十三陵游览区增加了又一新的景色供游人观赏。本文以十三陵抽水蓄能电站上池西北坡塌滑体锚索锚固为例,系统论述了预应力锚索在地质灾害防治中的应用。
【Abstract】 The upper reservoir of Shisanling pumped storage power station is located at the top of Mangshan Mountain.It is used not only for sluice and electricity generating,but also a new sight sport as "sky pond" in Shisanling recreation area.Taking the anchoring of northwestern collapsebody at the upper reservoir of Shisanling pumped storage power station as an example,this paper systematically elaborate the application of prestressing anchored cable in of the prevention of geologic hazard.
【关键词】 十三陵;
蓄能电站;
预应力;
锚索锚固;
【Key words】 Shisanling; storage power station; prestressing force; anchored cable and anchoring;
【Key words】 Shisanling; storage power station; prestressing force; anchored cable and anchoring;
- 【文献出处】 地质力学学报 ,Journal of Geomechanics , 编辑部邮箱 ,2003年02期
- 【分类号】TV223.3
- 【被引频次】1
- 【下载频次】48