节点文献

预应力锚索在十三陵抽水蓄能电站上池西北坡加固中的应用

APPLICATION OF PRESTRESSING FORCE ANCHORED CABLE IN THE FASTENING THE NORTHWESTERN SLOPE OF SHISANLING PUMPED STORAGE POWER STATION

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 汪西海王连捷葛增军吴满路武刚

【Author】 WANG Xihai,WANG Lianjie,GE Zengjun,WU Manlu,WU Gang(Institute of Geomechanics,CAGS,Beijing 100081,China)

【机构】 中国地质科学院地质力学所中国地质科学院地质力学所 北京 100081北京 100081北京 100081

【摘要】 十三陵抽水蓄能电站上池位于蟒山山顶,不仅蓄水发电,而且作为"天池"为十三陵游览区增加了又一新的景色供游人观赏。本文以十三陵抽水蓄能电站上池西北坡塌滑体锚索锚固为例,系统论述了预应力锚索在地质灾害防治中的应用。

【Abstract】 The upper reservoir of Shisanling pumped storage power station is located at the top of Mangshan Mountain.It is used not only for sluice and electricity generating,but also a new sight sport as "sky pond" in Shisanling recreation area.Taking the anchoring of northwestern collapsebody at the upper reservoir of Shisanling pumped storage power station as an example,this paper systematically elaborate the application of prestressing anchored cable in of the prevention of geologic hazard.

  • 【文献出处】 地质力学学报 ,Journal of Geomechanics , 编辑部邮箱 ,2003年02期
  • 【分类号】TV223.3
  • 【被引频次】1
  • 【下载频次】48
节点文献中: 

本文链接的文献网络图示:

本文的引文网络