节点文献
黄土塬区二维地震施工方法:以苏里格南工区为例
2D Seismic Prospecting Operation Techniques in Loess Tableland:An Example from Sulige Exploration Area
【摘要】 结合苏里格南工区试验分析和往年施工经验,运用基于目标的较大炮检距观测系统设计方法,缩短道间距,同时增大排列长度;采用三线生产方法提高覆盖次数;使用"多井组合、单井小药量"的激发方式等野外技术措施以求改进野外采集记录。试验对比表明,此方法明显改善了资料品质,提高了剖面的信噪比及分辨率,达到了高精度地震采集的设计效果,为苏里格南工区地震勘探提供了技术保障。
【Abstract】 We adopt the triaxial producing method to improve folds.The active way of multiwell association and small quantity of explosive of single well is chosen in the south of Sulige area.All the field steps are to improve the eismologic record.Contrasted with the former data and using this planned mehod,the data quality is improved obviously.Signal-to-noise ratio and degree of sophistication is also raised.The seismic data can attain the designed destination,and supply technical guarantee for seismic exploration.
【关键词】 黄土塬;
苏里格工区;
观测系统;
采集参数;
二维地震勘探;
【Key words】 loess tableland; Sulige exploration area; observation system; acquisition parameter; 2D seismic prospecting;
【Key words】 loess tableland; Sulige exploration area; observation system; acquisition parameter; 2D seismic prospecting;
- 【文献出处】 地质科技情报 ,Geological Science and Technology Information , 编辑部邮箱 ,2012年04期
- 【分类号】P631.4
- 【下载频次】57