节点文献

岩体隧道开挖工程数值分析

NUMERICAL ANALYSIS OF ROCK TUNNEL EXCAVATION ENGINEERING

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 程潇

【Author】 CHENG Xiao;Geotechnical Research Institute,Hohai University;

【机构】 河海大学岩土工程研究所

【摘要】 公路隧道是一个形状扁平的建筑物,正常情况下只有进出两个工作面,施工较慢、工期较长。从目前我国公路隧道发展趋势来看,之后的很长一段时间,仍采用新奥法为主要施工方法,这也符合世界潮流。文章通过Midas/GTS软件,结合某锚喷支护围护方式的公路隧道,分析了岩体隧道台阶法和导坑法两种开挖方式开挖后各自的位移变化、围岩塑性区分布范围和锚杆轴力。

【Abstract】 Highway tunnel is a flat structure,under normal circumstances only exit in and out two working face,construction is slower,duration of construction is longer. From the current development trend of highway tunnel in China,after a long period of time,the new Austrian tunneling method is still used as the main construction method,which is also in line with the trend of the world. In this article,through MIDAS-GTS software,combined with highway tunnel of a way of anchor sprayed concrete supporting,analy that after excavation by using rock bench method and heading method two excavation methods,the respective displacement,surrounding rock plastic zone distribution range and the axial force of bolt.

【关键词】 岩体隧道台阶法导坑法数值分析
【Key words】 rock tunnelstep methodheading methodnumerical analysis
  • 【文献出处】 低温建筑技术 ,Low Temperature Architecture Technology , 编辑部邮箱 ,2014年12期
  • 【分类号】U455.4
  • 【下载频次】27
节点文献中: 

本文链接的文献网络图示:

本文的引文网络