节点文献

浅层地震勘探数据拟同步采集时差分析与实践

Analysis of time difference in quasi-synchronous acquisition of shallow seismic data and its practice

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 朱德兵平利姣朱自强

【Author】 ZHU De-bing,PING Li-jiao,ZHU Zi-qiang(Centrol South University,School of Info-physics and Geomatics Engineering,Changsha 410083,China)

【机构】 中南大学信息物理工程学院

【摘要】 理想的地震勘探数据采集,其硬件系统采用多道同步方式实现,保证多路信号的时间或相位一致性.理论时差分析表明,就地震信号的初至时刻来看,多路同步采集系统也存在系统误差.浅层地震勘探数据记录道数少,采用单个A/D模数转换器件通过逻辑系统控制实现少量地震道的多路循环分时采集,在满足采样定理所需采样频率和不增加地震信号初至系统误差的前提下,可以以较少的硬件成本实现浅层地震信号的有效采集,这种采集方式我们称之为有效拟同步采集;通过实践证明了其采集方式的有效性.

【Abstract】 The data acquisition of ideal seismic survey is often realized by its hardware system using the multi-channel synchronous mode to keep time-consistency of multi-channel signal.Theoretical analysis of the time difference shows that the multi-channel synchronous acquisition system also has system errors in the pick of first arrive.The channel number of shallow seismic prospecting is not large, so we can use a logic system to control a signal A/D to collecting data channel by channel.It can realize data acquisition effectively with less hardware cost in the condition that the sample frequency satisfying the sampling theorem and not increasing the system error.This data acquisition mode is called effective pseudo-synchronous acquisition.Its validity has been validated by practice.

【基金】 湖南省交通厅重大科研项目公路隧道掘进突发地质灾害预报与评价技术研究项目(200624)资助
  • 【文献出处】 地球物理学进展 ,Progress in Geophysics , 编辑部邮箱 ,2008年06期
  • 【分类号】P631.4
  • 【被引频次】7
  • 【下载频次】201
节点文献中: 

本文链接的文献网络图示:

本文的引文网络