节点文献

钉结护面板对高土石坝坝坡地震稳定性影响研究

Study of effects of nail-tied panel on stability of high earth-rockfill dam slope

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 邹德高徐斌孔宪京

【Author】 ZOU De-gao1,2, XU Bin1,2, KONG Xian-jing1,21.State Key Laboratory of Coastal and Offshore Engineering,Dalian University of Technology,Dalian 116024,China; 2.School of Civil and Hydraulic Engineering,Dalian University of Technology,Dalian 116024,China

【机构】 大连理工大学海岸和近海工程国家重点实验室大连理工大学土木水利学院

【摘要】 建立了考虑钉结护面板作用的土石坝坝坡地震稳定和滑移计算方法.在此基础上,对比分析了无加固措施和采用钉结护面板两种工况下295 m级两河口心墙堆石坝的坝坡稳定性.结果表明:采用钉结护面板后,坝坡最小安全系数对应的滑弧加深,安全系数明显提高,滑移量减小,有效地增加了坝顶的整体稳定性;随输入地震动峰值增加,钉结护面板对坝坡稳定安全系数的贡献逐渐增大.

【Abstract】 Considering nail-tied panel effect,a method of calculating rockfill dam slope seismic stability and slippage was established.Based on the method,the slope stability of the Lianghekou core dam with 295 m in height was analyzed,and the effects of nail-tied panel on the stability of high earth-rockfill dam slope were studied.The results show that with nail-tied panel,the slip surface corresponding to the minimum safety factor becomes deeper,the dam slope safety factors are improved obviously,and the dam stability is enhanced effectively.With the increase of the earthquake peak acceleration,the dam slope stability can benefit from nail-tied panel significantly.

【基金】 国家自然科学基金资助项目(重大项目90815024);国家自然科学基金雅砻江水电开发联合研究基金资助项目(50679093);国家自然科学基金青年基金资助项目(50808032);“十一五”国家科技支撑计划资助项目(2009BAK56B02)
  • 【文献出处】 大连理工大学学报 ,Journal of Dalian University of Technology , 编辑部邮箱 ,2009年05期
  • 【分类号】TV641.1
  • 【被引频次】5
  • 【下载频次】226
节点文献中: 

本文链接的文献网络图示:

本文的引文网络