节点文献

5·12汶川地震对磨子沟的影响及震后泥石流活动状况

Debris Flow Activity of Mozi Gully after Wenchuan Earthquake on May 12

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 苏鹏程韦方强程尊兰

【Author】 SU Peng-cheng1,2,WEI Fang-qiang1,2,CHENG Zun-lan1,2(1.Key Laboratory of Mountain Hazards and Surface Process under Chinese Academy of Sciences, Chengdu 610041,China;2.Institute of Mountain Hazards and Environment under Chinese Academy of Sciences & Ministry of Water Resources,Chengdu 610041,China)

【机构】 中国科学院山地灾害与地表过程重点实验室中国科学院水利部成都山地灾害与环境研究所

【摘要】 磨子沟位于四川省汶川县银杏乡,属岷江上游右岸支流,5·12汶川地震对其造成了严重影响。地震引发了大量的崩塌、滑坡,其中8处大型崩塌和滑坡对沟道造成了严重堵塞,并为泥石流活动提供了良好的条件。地震后磨子沟泥石流十分活跃,仅2008年7-9月就暴发了75阵阵流,3次堵断岷江并形成堰塞湖,淹没了岷江左岸村庄;2009-2011年又多次暴发泥石流并堵塞岷江。持续的降雨监测数据表明,震后初期磨子沟发生泥石流的日雨量条件急剧降低,目前有逐步回升的趋势。通过对比磨子沟流域震前(2005年6月)、震后(2008年6月)及泥石流事件后(2010年12月)等不同时段的遥感影像,结合实地调查和震后高分辨率航空影像的解译,分析了地震对磨子沟的影响,估算出地震形成的崩塌和滑坡方量超过3 000×104m3;根据不同暴雨频率下的泥石流流量计算,得出2008年7月14日最大一场堵江泥石流的规模为2.57×105m3,其峰值流量为541 m3/s,为50年一遇的规模;已发生的泥石流仅从沟道内带走约2.5×106m3的固体松散物质,沟内剩余的巨量固体松散物质将使磨子沟的泥石流活动持续相当长的时间,并具有再次堵断岷江的风险。

【Abstract】 The Mozi gully,located in Yinxing,Wenchuan County of Sichuan province,is a tributary of Minjiang River at the right bank.This gully was seriously affected by the Wenchuan earthquake on May 12,2008.Numerous collapses and landslides triggered by the earthquake provided abundant materials for debris flow,and eight of them blocked Mozi gully.Debris flows had occurred many times in this gully from July to September in 2008 and 2010,and blocked the Minjiang River for 3 times and inundated villages on the left bank.Similar situations happened in 2009,2010 and 2011.According to field investigation and interpretation of remote sensing images and aerial images in different periods,there are more than 3 000×104 m3 solid loose materials in Mozi gully after the earthquake.According to debris flows in different rainstorm frequencies,the biggest debris flow on July 14,2008 is calculated to be 257 000 m3,with a peak discharge of 541 m3/s,once in half a century.The sediment volume carried out from the gully is only 2.5×106 m3,and the left materials are still of high risk of triggering debris flows and blocking the Minjiang River.

【关键词】 磨子沟汶川地震泥石流滑坡堰塞湖
【Key words】 Mozi gullyWenchuan earthquakedebris flowlandslidedammed lake
【基金】 国家科技支撑计划课题(2008BAK50B04);水利部公益性行业专项(2008011032)
  • 【文献出处】 长江科学院院报 ,Journal of Yangtze River Scientific Research Institute , 编辑部邮箱 ,2012年02期
  • 【分类号】P642.23
  • 【被引频次】14
  • 【下载频次】376
节点文献中: 

本文链接的文献网络图示:

本文的引文网络