节点文献

运营期隧道带裂缝二衬承载力评价

Evaluation of Carrying Capacity of Tunnel with Cracks of Secondary Lining during Operation Period

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 王晓形

【Author】 Wang Xiaoxing1,2(1.Shanghai Tongji Construction Quality Testing Station,Shanghai 200092,China;2.Shanghai Tongyan Civil Engineering Technology Co.,Ltd.,Shanghai 200092,China)

【机构】 上海同济建设工程质量检测站上海同岩土木工程科技有限公司

【摘要】 为研究运营期隧道二衬开裂后对于衬砌结构承载力和安全性能的影响,基于隧道裂缝调查结果,结合二次衬砌质量检测结果,建立带裂缝衬砌计算模型,分析带裂缝隧道衬砌结构的实际承载能力及裂缝对二次衬砌结构安全性的影响程度。

【Abstract】 For the evaluation of carrying capacity and safety performance of the tunnel with crack on secondary lining during operation period,based on the findings of tunnel cracks,combined with the test results of the quality of secondary lining,a calculation model for the lining with cracks is established.The actual carrying capacity of lining with cracks and the impact of cracking on the security of the secondary lining structure are analyzed.

【关键词】 隧道裂缝二衬承载力评价
【Key words】 tunnelcracksecondary liningcarrying capacity evaluation
  • 【文献出处】 地下空间与工程学报 ,Chinese Journal of Underground Space and Engineering , 编辑部邮箱 ,2012年S1期
  • 【分类号】U451.4
  • 【被引频次】4
  • 【下载频次】181
节点文献中: 

本文链接的文献网络图示:

本文的引文网络