节点文献
城市地铁高架桥混凝土疏散平台施工技术
Construction Technology of Concrete Evacuation Platform for Urban Subway Viaduct
【摘要】 此工法介绍了城市轨道项目中适合机械化施工的一种混凝土疏散平台施工方法,其基本原理是通过砂浆垫层调整混凝土预制构件疏散平台的位置。安装过程机械化程度高,提高了施工效率,同时无需轨道车及轨道吊等大型设备,节省了施工成本。
【Abstract】 This construction method introduces a kind of concrete evacuation platform construction method suitable for mechanized construction in urban rail projects. Its basic principle is to adjust the position of the concrete prefabricated component evacuation platform through the mortar cushion. The installation process is highly mechanized, which improves the construction efficiency. At the same time, the construction cost is saved without large-scale equipment such as rail car and rail crane.
- 【文献出处】 中小企业管理与科技(下旬刊) ,Management & Technology of SME , 编辑部邮箱 ,2020年02期
- 【分类号】U231.3;U445.57
- 【下载频次】30